File:LockBlockedafterBridgeStrikes.jpeg
Original file (2,259 × 1,656 pixels, file size: 476 KB, MIME type: image/jpeg)
Summary
Source: https://twitter.com/ArtisanalAPT/status/1580049554618994688/photo/1 via https://twitter.com/bayraktar_1love/status/1572296329144958977?cxt=HHwWgoCwxcrL9dErAAAA
Picture dated Oct 7, 2022
After repeated strikes on the road crossings over the lock, in autumn '22 the Russians apparently filled the canal to rebuild the road across. Presumably the lock canal also had the function of being an overflow to release high water around the dam. If the canal remained blocked this safety feature would not have been there to manage the high levels in the reservoir above in spring '23.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 06:59, 18 June 2023 | 2,259 × 1,656 (476 KB) | Diagonal (talk | contribs) | Source: https://twitter.com/ArtisanalAPT/status/1580049554618994688/photo/1 via https://twitter.com/bayraktar_1love/status/1572296329144958977?cxt=HHwWgoCwxcrL9dErAAAA After repeated strikes on the road crossings over the lock, in autumn '22 the Russians apparently filled the canal at one point to be able to cross. Presumably the lock canal also had the function of being an overflow to release high water around the dam. If the canal remained blocked this safety feature would not have been t... |
You cannot overwrite this file.
File usage
The following 2 pages use this file: